Built for Oracle NetSuite Manufacturing 3 Modules · 1 Bundle

End-to-end manufacturing on NetSuite — configure, cost, build.

AVT Manufacturing SuiteApp is one NetSuite-native bundle covering everything a manufacturer needs after the standard module runs out: rules-based Configure-Price-Quote, live BOM costing & what-if analysis, drag-and-drop production scheduling and a mobile shopfloor app.

CPQ & Product Configurator Rules-based configuration, dynamic pricing, auto-BOM & Work Order generation
BOM Costing & What-if Location-based cost roll-ups, scenario modelling, component shortage alerts
Production Scheduling & Shopfloor Drag-and-drop scheduler, capacity board, mobile shopfloor app for operators
Manufacturing Operations · Live
Connected
● CPQ Quote #4521 · accepted 9:14am
Industrial Press · 14 options configured
Quote value$84,300
Margin▲ 52%
● BOM COSTING Roll-up complete · 0.4s
42 components costed across 3 levels
Total cost$42,150
Shortages2 alerts
● PRODUCTION WO-1842 scheduled · Mon 8am
Work Order on Line 3 · 4 operations
Est. completeWed 4pm
Capacity used68%
12
Quotes today
38
WOs open
94%
On time
Launch Story

See AVT Manufacturing in action

A 90-second tour of how AVT Manufacturing unifies CPQ, BOM costing and production scheduling — purpose-built for NetSuite.

Built For NetSuite Manufacturers
🛠️
Make-to-Order
Configured products
📦
Make-to-Stock
Inventory production
📐
Engineer-to-Order
Custom & one-off
⚙️
Discrete Mfg
Assembly lines
🏭
Job Shop
Mixed-mode work
🔧
Contract Mfg
Multi-customer
1B+
Product Configurations
1000+
AVT Mfg Projects
100%
Native NetSuite
4–10 wks
Time to Go-Live

One bundle. Three modules. Zero re-entry.

AVT Manufacturing is built around the three places manufacturers lose time and margin: quoting complex configured products, costing multi-level BOMs and getting the shopfloor to execute on the plan. Each module solves one of those problems — and they hand off to each other natively inside NetSuite.

Module 01
⚙️
CPQ & Product Configurator
Configure · Price · Quote
Sales teams configure complex products via guided wizards. Rules prevent invalid combinations. Pricing and margin update in real time.
  • Billions of configurations handled
  • Auto-BOM & Work Order on accept
  • SuiteCommerce-compatible
Explore CPQ →
Module 02
📊
BOM Costing & Management
Roll-up · Model · Alert
Location-based cost roll-ups across multi-level BOMs in seconds. What-if scenarios for component substitutions. Shortage alerts before production starts.
  • Real-time cost roll-up
  • What-if scenario modelling
  • Shortage & CSV export reporting
Explore BOM Costing →
Module 03
🏭
Production & Shopfloor
Schedule · Execute · Cost
Drag-and-drop production scheduler with capacity board. Mobile shopfloor app for operators. Real-time job costing and exception management.
  • Visual scheduling board
  • Mobile shopfloor app (iOS / Android)
  • Planned vs. actual job costing
Explore Production →
Module 01 · CPQ

Configure complex products in minutes, not days

Eliminate spreadsheet-based quoting. AVT CPQ brings structured product configuration, dynamic pricing and instant BOM generation natively into NetSuite — handling everything from a few options to billions of valid combinations.

  • 🎛
    Rules-based configuration engineFeatures, options and business rules prevent invalid combinations. Sales configures without engineering sign-off.
  • 💰
    Dynamic pricing & live marginPricing updates in real time as options selected. Sales sees margin live on Opportunities, Quotes and Orders.
  • 📄
    Quote PDFs from NetSuiteGenerate and email quote PDFs straight from the configurator — no Word docs, no manual margin checks.
  • 🔗
    Auto BOM & Work Order handoffAccepted quote creates a configured BOM and Work Order in NetSuite Manufacturing — zero re-keying, full audit trail.
  • 🛒
    SuiteCommerce readySame configurator engine drives B2B and B2C web storefronts on SuiteCommerce Advanced.
See a live CPQ demo →
netsuite.com › CPQ Configurator › Quote #4521
3
4
Step 3 · Press capacity & control system
200-ton hydraulic press+$24,500
150-ton hydraulic press+$18,200
Siemens S7-1500 controller+$8,400
Allen-Bradley CompactLogix+$7,150
Quote total (live)
$84,300
Margin
52%
Module 02 · BOM Costing

Multi-level cost roll-ups in seconds — not Excel days

Stop exporting BOMs to spreadsheets every time finance asks "what does this cost?". AVT BOM Costing reads live NetSuite component values and runs full multi-level roll-ups in real time, with what-if scenarios and shortage alerts built in.

  • 📍
    Location-based cost calculationRoll-up uses current component cost at the specified NetSuite location — multi-warehouse manufacturers get accurate cost per site.
  • 🧮
    Stock / Non-Stock / Service splitCost broken down by category so procurement, finance and production see what's driving the total.
  • ⚠️
    Component shortage alertsIdentify at-risk components before production starts — proactive purchasing instead of reactive firefighting.
  • 🔁
    What-if scenario modellingModel substitutions, price changes and quantity shifts before committing to a quote or work order.
  • 📤
    CSV / Excel exportSend any cost breakdown or shortage report to finance and purchasing in one click.
See a live BOM Costing demo →
netsuite.com › BOM Costing › Assembly IND-PRESS-200
IND-PRESS-200 Industrial Press$42,150
Hydraulic ram assembly$18,420
Steel cylinder · 200T$8,200
Pump · Bosch Rexroth$6,400
Valve manifold$3,820
Control panel assembly$11,580
Siemens S7-1500 PLC$5,800
HMI touchscreen 10in$2,950
Safety relay · qty 4 short$2,830
Frame & safety guarding$12,150
$42.15k
Roll-up
3
Levels deep
2
Shortages
Module 03 · Production & Shopfloor

Replace the whiteboard with a real scheduler — and put the shopfloor on a tablet

Drag-and-drop work order scheduling against work-centre capacity. Mobile shopfloor app for operators to view operations, capture time and complete WOs. Real-time job costing rolls back into NetSuite for variance analysis.

  • 📅
    Drag-and-drop scheduling boardVisual production planner with capacity by work-centre — estimate delivery dates and rebalance load in minutes.
  • 📱
    Mobile shopfloor appOperators view work orders, instructions and drawings on tablets. Capture time, quality data and notes by touch.
  • 📈
    Planned vs. actual job costingLabour, materials and overhead captured at the operation level. Variances surface live for the cost accountant.
  • 🚨
    Exception & bottleneck alertsAt-risk work orders, capacity overloads and missed milestones flagged on the production dashboard before they hit delivery.
  • 🗂
    Job-bag & project managementGroup related work orders on a single job bag with full project Gantt and resource scheduler.
See a live Production demo →
netsuite.com › Production Scheduler › Week 26
Line 1
WO-1820
Line 2
WO-1835
Line 3
WO-1842
Line 4
WO-1851
Assembly
WO-1828
MonTueWedThuFri
9:42● ● ●
Shopfloor · Line 3
WO-1842
01:14:08
Op 02 · Hydraulic assembly
Op 01 · Frame weld
Std 1.5h · actual 1.4h
Done
Op 02 · Hydraulic
Std 2.0h · in progress
Active
Op 03 · Control panel
Std 1.5h · queued
Todo

Quote → Cost → Build — all inside NetSuite

No handoffs to external tools, no CSV exports between systems, no manual re-keying. One unified workflow from the moment sales configures the first option to the operator completing the final operation on the shopfloor.

1
CPQ
Configure
Sales selects features via guided wizard. Rules block invalid combos.
2
CPQ
Quote
Dynamic pricing & margin. PDF sent from NetSuite.
3
BOM
Cost
Multi-level roll-up. Shortage check. What-if if needed.
4
PROD
Schedule
WO & routing auto-created. Dragged onto work-centre.
5
PROD
Build
Operators run the WO on the shopfloor mobile app.
6
PROD
Cost & Close
Actuals captured. Variance vs. plan rolls into job costing.

Whatever your manufacturing mode — one bundle covers it

Whether you make-to-order with complex configurations, run high-volume make-to-stock, engineer one-off equipment or operate a job shop with mixed-mode work, AVT Manufacturing was built for your operation.

🛠
Make-to-Order
Configured products with thousands of variants. CPQ + auto-BOM + scheduled production from a single quote acceptance.
CPQ Auto-BOM Configured WOs
📦
Make-to-Stock
Volume production runs from demand forecasts. Capacity scheduling, shopfloor execution and job costing at scale.
Scheduler Capacity Job Cost
📐
Engineer-to-Order
Custom, one-off equipment with project-style job bags. Full Gantt, resource scheduler and BOM revision control.
Job Bags Gantt Revisions
🏭
Job Shop & Mixed-Mode
High-mix, low-volume work across multiple customers. Visual scheduler, mobile shopfloor and live exception management.
High-mix Exceptions Mobile

Three modules. Three real customer wins.

Manufacturers running AVT Manufacturing across CPQ, BOM Costing and Production — in their own words.

AVT CPQ transformed our quoting process. We configure products with over a billion possible combinations — before CPQ we relied on spreadsheets and engineering sign-off. Now our sales team quotes in minutes, with margin visibility built in.

BOM Costing gave our production planning team real-time cost visibility we have never had before. What-if analysis on component price changes used to take days in Excel. Now it takes seconds inside NetSuite — and the shortage report has saved us from two production stoppages this quarter.

AVT Manufacturing gave us visibility across our factory we didn't have before. The drag-and-drop scheduler replaced a wall of whiteboards. The shopfloor app means our operators capture time in real time — and our job costs are finally accurate.

Go live in 4–10 weeks with AVT's senior NetSuite consultants

A proven SuiteApp deployment playbook delivered by senior AVT NetSuite consultants — no offshore juniors, no surprise scope changes. Single-module rollouts can go faster; full three-module deployments typically land in 8–10 weeks.

1
Discover
Current-state workshops across sales, costing & production. Module fit assessment.
Week 1
2
Design
Configure rules, BOMs, work centres, routings, mobile app rollout plan.
Weeks 2–4
3
Build & Integrate
SuiteApp install, custom roles, dashboards, AVT integrations live.
Weeks 3–7
4
Train & UAT
Sales, planning & shopfloor training. Parallel running. Refinement sprints.
Weeks 6–9
5
Go Live
Cutover, 30-day hypercare, optimisation sprint post first month-end.
Week 10

NetSuite manufacturer questions, answered

Do I need all three modules — or can I start with just one?
You can deploy any single module standalone (CPQ, BOM Costing or Production & Shopfloor) and add the others later. Most customers start with the most painful module first — usually scheduling for MTO shops, CPQ for complex configured products, or BOM Costing for margin-sensitive operations.
How does this work with standard NetSuite Manufacturing?
AVT Manufacturing is built natively on top of NetSuite Manufacturing — it doesn't replace it. The bundle uses NetSuite's standard BOMs, Work Orders, Routings and Cost Categories, then adds the configuration, costing and shopfloor layers that the standard module lacks. If you're not yet on NetSuite Manufacturing, AVT can scope that as part of the deployment.
Does CPQ work with SuiteCommerce for online configuration?
Yes. The same configurator engine drives both internal sales (NetSuite) and online customer-facing storefronts on SuiteCommerce Advanced (SCA). Pricing, rules and BOM generation are identical across both channels.
Can the shopfloor app run offline?
The mobile shopfloor app is designed for connected factory environments and works on standard Android (8.0+) and iOS (13+) tablets. Operators can continue capturing time and notes briefly if WiFi drops — entries sync once connection returns.
Does BOM Costing handle multi-level and Advanced BOMs?
Yes. BOM Costing rolls up across standard BOMs, NetSuite Advanced BOMs, phantom assemblies, multi-level structures and revision-controlled BOMs. Location-based cost lookup respects multi-warehouse and OneWorld subsidiary boundaries.
How long does a typical deployment take?
Single-module rollouts (CPQ only, BOM only, or Production only) typically run 4–6 weeks. A full three-module deployment lands in 8–10 weeks with AVT's parallel-track approach. Multi-site or OneWorld manufacturers usually add 2–4 weeks per additional site.
Does it support OneWorld & multi-subsidiary manufacturing?
Yes — full NetSuite OneWorld support across CPQ rules, BOM costing by location, and per-subsidiary production scheduling. Each plant or sub planner sees only their site; senior management gets consolidated visibility.
What does AVT Manufacturing cost?
Pricing depends on which modules you deploy, number of plants, shopfloor devices and number of CPQ users. AVT will model the right bundle for your operation in a 30-minute call — request pricing here.

Ready to put your whole factory on NetSuite?

Book a 30-minute scoping call with AVT's senior NetSuite manufacturing consultants. We'll walk through your current state — sales, costing, scheduling, shopfloor — and show you which modules would deliver the fastest ROI for your operation.